The state plans to fix a legal boundary along 0.91 mile of Jupiter's beach before new sand goes on. Anyone can ask questions or object online Wednesday, Nov. 18.
The state plans to draw a permanent legal boundary along almost a mile of Jupiter’s ocean beach. It is the step Florida law requires before Palm Beach County can pump new sand onto it. The public gets its say at an online workshop and hearing from 5 to 7 p.m. Wednesday, Nov. 18.
The line is called an erosion control line. Once it is recorded, the sand on the ocean side belongs to the state and the land behind it belongs to the property owners. The boundary then stops moving as the beach grows or washes away.
The state’s Board of Trustees of the Internal Improvement Trust Fund announced the hearing in a public notice in The Palm Beach Post. It runs Nov. 1, 8 and 15.
Where the line would run
The notice says the proposed line:
- runs along the Atlantic shoreline of the Town of Jupiter at the mean high water line
- is about 0.91 mile long
- sits between the state’s beach survey markers R-21.3 and R-25.9
- follows the high water line as surveyed on April 6, 2026
The survey coordinates in the notice place the line on the beach east of South A1A, starting about a third of a mile south of Carlin Park and running south. The notice does not name streets or buildings.
The line is for the county’s North County Comprehensive Shore Protection Project, Segment II. The state budget calls that work the South Jupiter Beach Restoration Project. It sets aside $3,821,618 in state money for it this budget year, with no contract signed yet, according to the Florida Department of Environmental Protection’s report for the first quarter.
Sand this winter
A county coastal official told the town’s Beach Committee in July that all three segments of the north county project would be under construction this winter. Andy Studt of the county’s Department of Environmental Resources Management said that meant Nov. 1 to the end of April, according to the committee’s draft minutes of the July 27 meeting. They are in the packet for its Oct. 26 meeting.
The minutes record that Studt:
- said there would be intermittent beach access closures during the work
- said Segment 2 would also get a larger planting project to restore the area
- showed the committee high water surveys with the proposed erosion control line
- said the county would hold a public hearing in Jupiter on the line in August
That hearing did not happen in August. The state’s notice now sets it for Nov. 18, online only.
The county last rebuilt the dune on this segment in 2022, its South Jupiter Dune Restoration page says. That job placed about 35,321 tons of sand and 39,000 native dune plants. A smaller 2020 repair fixed damage from Hurricane Irma.
The late October king tides also took sand from the beach farther north. Erosion damaged the walkway and stairs at the Jupiter Civic Center at Carlin Park, which is closed.
What the line changes for beachfront owners
Section 161.191 of Florida Statutes sets out what happens once the line is recorded:
- land on the ocean side of the line belongs to the state
- land on the landward side belongs to the upland owners
- the boundary no longer shifts as sand builds up or erodes
Owners keep their rights to reach the water, keep their view, swim, boat and fish, under Section 161.201. The state may not allow buildings on the sand seaward of the line, except structures that stop erosion.
Section 161.141 says the state does not intend to claim land it does not already hold. The trustees can still decline to set the line, the notice says.
How to take part
The workshop and hearing run from 5 to 7 p.m. Wednesday, Nov. 18:
- Online: a Microsoft Teams link, meeting ID and passcode are in the state’s notice
- By phone: 872-242-8934, conference ID 138 027 473#
- The workshop is for questions about the line
- The hearing follows it, for comments, support or objections about where the line goes and how it was located
Written objections and questions go to the Department of Environmental Protection’s Beaches, Inlets and Ports Program, c/o William Guy Weeks, 2600 Blair Stone Road, Mail Station 3544, Tallahassee, FL 32399-2400. The email address is william.weeks@FloridaDEP.gov and the phone number is 850-245-7696. Written comments are accepted for two more weeks after the hearing.
What it means for you
- If you own oceanfront property on this stretch, this hearing sets the boundary of your land for good. Check the line against your survey before Nov. 18.
- If you use the beach, expect new sand and some access closures this winter, the county told the town. We will report closure dates when the county posts them.
- Live near the beach? Our beachfront neighborhoods guide covers the A1A corridor, and our hurricane and flood prep page covers flood zones.
We will report what the hearing decides.
Have your say